Black Star Observatory
42°n, 73°w
Above you can see the 1st light images taken 3/28/06
----
![]() |
![]() |

Black Star Observatory was created to permanently house my 20" Obsession Telescope along with several others telescopes. The 28'x15' building is a combination Shop (15'x13') and Observatory (15'x15') to fill all my needs at our new house here in the Berkshires. It is a roll-off roof design with many very original design features. Including the most obvious, a roll-off roof that rolls onto another structure (the shop). This design maximizes space and utility.
Click a thumbnail below to see a larger view.
Day one (Oct 3rd, 2005)
![]()
Day two (Oct 5th, 2005)
Shop floor - A little help from Jim B. - Me
![]()
Day three (Oct 7th, 2005)
3 walls of shop and floor of observatory are up
![]()
Day four (Oct 11th, 2005)
Megan on pier - Looking north - Looking southeast through observatory access door at our house
![]()
Day five (Oct 20th, 2005)
Notice warm room window framed up, but yet to be cut out on left - Isolated Obsession pier - All walls framed up
![]()
Day six (Oct 27th, 2005)
All the siding is on, window and garage door cut out!!
The structure looking northwest - The structure looking north, you can see the small "under observatory garage"
Observatory southeast corner - Shop southwest corner - Shop northwest corner - Observatory northeast corner
"under observatory garage"
![]()
Day 7th-10th (Nov 3rd, 2005)
Structure fully painted & shop roof ready for glasteel panels - Wide shot looking north
![]()
Day 11th-14th (Nov 11th, 2005)
Paint, doors, trim, and shop roof completed (looking north)
![]()
Day 15th-19th (Nov 28th, 2005)
Roll off roof constructed, rubber weather-stripping 1/2 way installed.
![]()
Day 20th (Nov 29th, 2005)
Roll off roof paint done!
![]()
Day 21st (Nov 30th, 2005)
All trim, paint, and rubberizing finished
Interior framing detail
Roll off roof track and caster close ups
![]()
Day 22nd (Dec 4th, 2005)
Track extensions added, exterior finished!! Yahoo!!
![]()
Day 23rd-25th (Dec 5th-8th, 2005)
Shop/warm room walls & ceiling insulation completed...
Shop/warm room walls hard boarded & peg boarded...shop basically ready to go...
![]()
1st light Dec27th....bam!!!
![]()