Black Star Observatory

42°n, 73°w

 

     

Above you can see the 1st light images taken 3/28/06

  Grand opening Dec27th

----

 

Black Star Observatory was created to permanently house my 20" Obsession Telescope along with several others telescopes. The 28'x15' building is a combination Shop (15'x13') and Observatory (15'x15') to fill all my needs at our new house here in the Berkshires. It is a roll-off roof design with many very original design features. Including the most obvious, a roll-off roof that rolls onto another structure  (the shop). This design maximizes space and utility.

Click a thumbnail below to see a larger view.

Day one (Oct 3rd, 2005)

orb_blu.gif (1847 bytes)

Day two (Oct 5th, 2005)

      

Shop floor - A little help from Jim B. - Me

orb_blu.gif (1847 bytes)

Day three (Oct 7th, 2005)

3 walls of shop and floor of observatory are up

orb_blu.gif (1847 bytes)

Day four (Oct 11th, 2005)

   

Megan on pier - Looking north - Looking southeast through observatory access door at our house

orb_blu.gif (1847 bytes)

Day five (Oct 20th, 2005)

           

Notice warm room window framed up, but yet to be cut out on left - Isolated Obsession pier - All walls framed up

orb_blu.gif (1847 bytes)

Day six (Oct 27th, 2005)

All the siding is on, window and garage door cut out!!

             

The structure looking northwest - The structure looking north, you can see the small "under observatory garage"

     

Observatory southeast corner - Shop southwest corner - Shop northwest corner - Observatory northeast corner

"under observatory garage"

orb_blu.gif (1847 bytes)

Day 7th-10th (Nov 3rd, 2005)

 

Structure fully painted & shop roof ready for glasteel panels - Wide shot looking north

orb_blu.gif (1847 bytes)

Day 11th-14th  (Nov 11th, 2005)

Paint, doors, trim, and shop roof completed (looking north)

orb_blu.gif (1847 bytes)

Day 15th-19th  (Nov 28th, 2005)

         

Roll off roof constructed, rubber weather-stripping 1/2 way installed.

orb_blu.gif (1847 bytes)

Day 20th  (Nov 29th, 2005)

Roll off roof paint done!

orb_blu.gif (1847 bytes)

Day 21st  (Nov 30th, 2005)

 

All trim, paint, and rubberizing finished

   

Interior framing detail

       

Roll off roof track and caster close ups

orb_blu.gif (1847 bytes)

Day 22nd  (Dec 4th, 2005)

   

Track extensions added, exterior finished!! Yahoo!!

orb_blu.gif (1847 bytes)

Day 23rd-25th  (Dec 5th-8th, 2005)

   

Shop/warm room walls & ceiling insulation completed...

       

Shop/warm room walls hard boarded & peg boarded...shop basically ready to go...

orb_blu.gif (1847 bytes)

     

1st light Dec27th....bam!!!